Research Article
Timetable Optimization of Rail Transit Loop Line with Transfer Coordination
Table 1
Dwell time of trains and transfer time of passengers.
| | | S1 | S2 | S3 | S4 | S5 | S6 |
| Dwell time (s) | Line 1 | — | — | 30 | — | — | 30 | Line 2 | 35 | 20 | 30 | 25 | 35 | 35 | Line 3 | 30 | — | — | — | 35 | — |
| Transfer time (s) | | 90 | — | 80 | — | 80 | 90 |
|
|