Research Article
A Hybrid IP/GA Approach to the Parallel Production Lines Scheduling Problem
Figure 2
Cable assignments excluded by the valid inequalities.
(a) A cable assignment against the production capacity inequality |
(b) An assignment against the production time equilibrium inequality |