A Hybrid IP/GA Approach to the Parallel Production Lines Scheduling Problem
Table 2
Experimental result for the small sized problems.
| Problem | | Objective value | CPU time (seconds) | MILP/CP | IP/GA | MILP/CP | IP/GA |
| 1 | | 56 | 56 | 3.41 | <1 | 2 | | 58 | 58 | 0.86 | <1 | 3 | | 61 | 61 | 1.14 | 1.13 | 4 | | 79 | 79 | 14.87 | 1.21 | 5 | | 81 | 81 | 3.48 | 1.79 | 6 | | 67 | 67 | 143.34 | 2.76 | 7 | | 94 | 94 | 23.55 | 4.84 | 8 | | 87 | 87 | 6.56 | 4.16 | 9 | | 67 | 67 | 31.42 | 2.89 | 10 | | 53 | 53 | 39.38 | 4.54 | 11 | | 102 | 102 | 207.51 | 5.30 | 12 | | 113 | 113 | 71.35 | 6.13 |
|
|
The optimal solution is obtained but gap is not equal to 0.
|