A Hybrid IP/GA Approach to the Parallel Production Lines Scheduling Problem

Table 2

Experimental result for the small sized problems.

ProblemObjective valueCPU time (seconds)
MILP/CPIP/GAMILP/CPIP/GA

156 56 3.41 <1
258 58 0.86 <1
361 61 1.14 1.13
479 79 14.87 1.21
581 81 3.48 1.79
667 67143.34 2.76
794 94 23.55 4.84
887 87 6.56 4.16
967 67 31.422.89
1053 53 39.38 4.54
11102 102207.51 5.30
12113 113 71.35 6.13

The optimal solution is obtained but gap is not equal to 0.