Research Article

An Improved Multiobjective PSO for the Scheduling Problem of Panel Block Construction

Figure 4

Distribution of optimal objective vectors generated by MOPSO-M, MOPSO, and NSGA-II in the performance evaluation experiment. (a) 10 × 7 fuzzy FSSP; (b) 20 × 7 fuzzy FSSP.
(a)
(b)