Research Article
An Improved Multiobjective PSO for the Scheduling Problem of Panel Block Construction
Figure 4
Distribution of optimal objective vectors generated by MOPSO-M, MOPSO, and NSGA-II in the performance evaluation experiment. (a) 10 × 7 fuzzy FSSP; (b) 20 × 7 fuzzy FSSP.
(a) |
(b) |