Research Article

An Improved Multiobjective PSO for the Scheduling Problem of Panel Block Construction

Table 7

Three examples of determining the processing sequence for the fuzzy FSSP using MOPSO-M.

IndexOptimal objective vectorsOptimal solutions (processing sequence)

10.550.300.154931.500.8980.0903-2-7-4-1-9-12-10-5-17-15-19-16-6-8-11-14-20-13-18
20.400.300.304954.000.9740.7233-2-7-1-4-9-10-5-12-17-15-19-6-16-13-8-11-14-20-18
30.300.350.354969.250.9900.8893-1-2-7-4-9-10-5-12-17-15-19-6-13-16-8-11-14-20-18