Research Article

Metaheuristics for Order Scheduling Problem with Unequal Ready Times

Table 8

ANOVA for the RPD for large number of orders.

Source of VariationDFSum of SquaresMean SquareF Value

Model123.37760.281539.89<.0001
Algorithm73.32580.475167.33<.0001
Size10.02850.02854.040.0466
machine20.01350.00670.950.3878
lamda20.00990.00490.70.4983
Error1310.92440.0071
Corrected Total1434.302