Implementation Flexibility of Multiperiod Rail Line Design with Consideration of Uncertainties in Population Distribution
Table 2
The benefit and penalty of each alternative.
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Notes: The original project start time as schedule is set as year 0. The planning and operation horizon is assumed to be same for the three alternatives. Normally, the following equations are held: or . |