Implementation Flexibility of Multiperiod Rail Line Design with Consideration of Uncertainties in Population Distribution

Table 2

The benefit and penalty of each alternative.

AlternativeProject start timeInterest rate
Growth factor of
population density per year
BenefitPenalty

DNA0ā€‰

Fast-tracked

Deferred

Notes:
The original project start time as schedule is set as year 0.
The planning and operation horizon is assumed to be same for the three alternatives.
Normally, the following equations are held:
or .