Research Article

Implementation Flexibility of Multiperiod Rail Line Design with Consideration of Uncertainties in Population Distribution

Table 6

Average IRR of the rail transit line project with respect to different growth factor of the total population over years.

Average growth factor Average IRR in each year (%)
Year = 1Year = 2Year= 3

0.22.4%7.3%8.5%

0.32.67.913.8

0.42.8%12.8%14.9%