Research Article
Model and Algorithm for Human Resource-Constrained R&D Program Scheduling Optimization
Table 10
Comparison of two models (real-life instance).
| Parameter | Traditional MRCPSP | Special MRCPSP (DP) |
| Program duration /day | 46 | 40 | Program duration reduction ratio /% | ā | 13 | Program cost /Chinese yuan | 19360 | 16335 | Program cost reduction ratio /% | ā | 15.6 |
|
|