Research Article
Model and Algorithm for Human Resource-Constrained R&D Program Scheduling Optimization
Table 11
Comparison of the best results obtained by GA and DP for solving special MRCPSP (real-life instance).
| Parameter | Special MRCPSP | Special MRCPSP | (GA) | (DP) |
| Program duration /day | 41 | 40 | Program duration reduction ratio /% | ā | 2.4 | Program cost /Chinese yuan | 17284 | 16335 | Program cost reduction ratio /% | ā | 5.5 |
|
|