Research Article

Model and Algorithm for Human Resource-Constrained R&D Program Scheduling Optimization

Table 11

Comparison of the best results obtained by GA and DP for solving special MRCPSP (real-life instance).

ParameterSpecial MRCPSPSpecial MRCPSP
(GA)(DP)

Program duration /day4140
Program duration reduction ratio /%ā€‰2.4
Program cost /Chinese yuan1728416335
Program cost reduction ratio /%ā€‰5.5