Research Article
Model and Algorithm for Human Resource-Constrained R&D Program Scheduling Optimization
Table 4
Comparison of two models (random instances).
| The number of actual activities | Traditional MRCPSP | Special MRCPSP | Average program duration | Average program cost | Average program duration | Program duration reduction% | Average program cost | Program cost reduction% |
| J=13 | 37 | 36730 | 26 | 29.7 | 19212 | 47.7 | J=15 | 49 | 58984 | 34 | 30.6 | 30807 | 47.8 | J=17 | 50 | 60631 | 34 | 32.0 | 30806 | 49.2 | J=19 | 60 | 52661 | 40 | 33.3 | 26269 | 50.1 | J=21 | 51 | 61870 | 37 | 27.5 | 32060 | 48.2 | J=23 | 59 | 83762 | 41 | 30.5 | 43782 | 47.7 |
|
|