Research Article
Optimal Design of Flow Corridors to Minimize Environmental Impact with Consideration of En-Route Weather Conditions
Table 3
The minimum total flight cost with major components.
| Total flight cost | Before optimization | After optimization | Reduction rate (%) |
| Time cost ($) | 41,378 | 40,244 | 2.74 | Fuel cost ($) | 346,147 | 335,036 | 3.21 | CO2 emissions cost ($) | 4,628 | 4,501 | 2.74 | Contrails cost ($) | 2,801 | 2,588 | 7.60 | In total ($) | 394,955 | 382,367 | 3.19 A |
|
|