Research Article

An Optimization Method for the Train Service Network Design Problem

Table 4

Dispatched train service.

O–DFreqO–DFreqO–DFreqO–DFreqO–DFreqO–DFreq

1–21.874–60.608–50.6812–11.0416–20.6119–60.67
1–40.444–70.458–110.7412–20.9316–60.5619–81.13
1–50.494–171.098–161.1012–30.7916–70.5619–100.41
1–60.994–180.748–211.4312–40.7616–80.7319–141.18
1–81.124–200.629–20.8512–101.0416–100.9119–151.26
1–100.635–11.119–50.5512–132.1116–110.6319–172.08
1–120.835–62.609–60.8312–151.4216–120.8519–200.96
1–160.465–80.449–82.2712–171.1916–152.3120–20.91
1–171.295–120.559–110.6712–183.7416–190.7120–40.70
1–210.685–130.539–120.7313–30.7416–200.5620–80.96
2–11.545–141.699–152.1113–40.7317–20.7920–131.31
2–33.175–180.749–191.3313–113.0017–40.6320–160.53
2–61.035–190.589–201.1613–123.3917–51.5620–191.09
2–70.696–30.9710–20.7113–201.2617–61.3020–210.25
2–120.726–51.5310–42.6114–11.3817–71.5921–20.90
2–140.916–113.4010–50.3914–21.9317–111.3821–40.64
2–150.766–141.3110–70.5714–61.0317–142.3821–50.73
2–171.746–160.9410–93.9514–83.5317–195.2621–80.97
3–22.336–180.7210–131.0814–134.1917–203.2721–90.96
3–51.986–190.7310–161.2214–175.4118–50.7521–120.35
3–82.216–200.8010–170.9314–181.2918–80.7421–150.83
3–100.877–21.1211–10.6115–51.2318–123.4121–172.25
3–121.087–101.2011–40.6915–70.5718–151.1521–180.52
3–141.197–111.8111–51.4715–94.3018–160.58
3–150.637–171.1211–61.2415–101.8218–191.23
3–190.598–10.8411-90.7015–131.4818–210.47
3–200.678–35.7011–170.9115–144.1919–10.69
4–32.298–41.3011–211.0915–163.8819–20.57