Research Article
An Optimization Method for the Train Service Network Design Problem
Table 9
Composition of the objective function of each case.
| | The optimized model | Comparative case | Reduced value | % Reduced |
| Total shuttle train service number | 39 | 62 | 23 | 37.1% | Total direct train service number (including shuttle train service) | 163 | 189 | 26 | 13.8% | Total local train service number | 62 | 62 | 0 | 0.0% | Accumulation costs (car-hour) | 145269 | 163635 | 18366 | 11.2% | Classification costs (car-hour) | 18041 | 17235 | −806 | −4.7% | Train operation costs (car-hour) | 459991 | 457930 | −2061 | −0.5% | Train travel costs (car-hour) | 37331 | 37195 | −136 | −0.4% | Total costs (car-hour) | 660632 | 675995 | 15363 | 2.3% |
|
|