Research Article
[Retracted] Production-Distribution of Perishable Food considering Customer Time Window
Table 3
Table of the initial production-distribution plan.
| Batch | Distribution route | The start time of production (min) | The start time of distribution (min) |
| 1 | 0⟶11⟶18⟶5⟶10⟶1⟶0 | 440.0 | 456.6 | 2 | 0⟶15⟶3⟶8⟶17⟶0 | 532.2 | 553.1 | 3 | 0⟶20⟶16⟶19⟶12⟶2⟶0 | 456.6 | 477.1 | 4 | 0⟶4⟶9⟶7⟶14⟶0 | 493.9 | 514.4 | 5 | 0⟶6⟶13⟶0 | 477.4 | 487.8 |
|
|