Rescheduling results for three typical scenarios at various
values (
).
| | Scenario A | Scenario B | Scenario C | Total cost (€) | Total curtailed power of loads (kW) | Total curtailed power of renewable energy (kW) | Total cost (€) | Total curtailed power of loads (kW) | Total curtailed power of renewable energy (kW) | Total cost (€) | Total curtailed power of loads (kW) | Total curtailed power of renewable energy (kW) |
| 0 | 546.1 | 0 | 0 | — | 103.1 | 0 | — | 0 | 80.6 | 1 | 546.1 | 0 | 0 | — | 103.1 | 0 | — | 0 | 80.6 | 2 | 546.6 | 0 | 0 | — | 103.1 | 0 | — | 0 | 8.4 | 3 | 548.4 | 0 | 0 | 873.06 | 71.2 | 0 | 423.11 | 0 | 0 |
|
|