Research Article

Risk Evaluation of Urban Integrated Pipe Corridor Operation and Maintenance Based on Improved AHP-CIM Model

Table 6

Probability distribution of the 1st superimposed parallel risk level.

Risk indicatorsOverall rating
SmallSmallerModerateLargerLarge

B3C890.030.010.10.220.64
C100.10.10.40.20.2
C110.20.10.50.10.1