Research Article

Risk Evaluation of Urban Integrated Pipe Corridor Operation and Maintenance Based on Improved AHP-CIM Model

Table 7

Probability distribution of the 2nd superimposed parallel risk level.

Risk indicatorsOverall rating
SmallSmallerModerateLargerLarge

B32nd superimposed valueC89100.0030.0050.0760.2040.712
C110.20.10.50.10.1