Research Article

Risk Evaluation of Urban Integrated Pipe Corridor Operation and Maintenance Based on Improved AHP-CIM Model

Table 8

Probability distribution of risk level B3 for the main risk at the guideline level.

Primary riskOverall rating
SmallSmallerModerateLargerLarge

B30.00060.00180.06480.1920.7408