Research Article
Risk Evaluation of Urban Integrated Pipe Corridor Operation and Maintenance Based on Improved AHP-CIM Model
Table 9
Probability distribution of risk levels for master risk at guideline level.
| Code level B risk factors | Comprehensive risk assessment rating | Small | Smaller | Moderate | Larger | Large |
| B1 | 0.0000 | 0.0000 | 0.0014 | 0.0868 | 0.9118 | B2 | 0.0000 | 0.0200 | 0.1200 | 0.3100 | 0.5500 | B3 | 0.0006 | 0.0018 | 0.0648 | 0.1920 | 0.7408 | B4 | 0.0000 | 0.0216 | 0.5454 | 0.3330 | 0.1000 | B5 | 0.0001 | 0.0000 | 0.0629 | 0.2954 | 0.6416 |
|
|