Research Article

Risk Evaluation of Urban Integrated Pipe Corridor Operation and Maintenance Based on Improved AHP-CIM Model

Table 9

Probability distribution of risk levels for master risk at guideline level.

Code level B risk factorsComprehensive risk assessment rating
SmallSmallerModerateLargerLarge

B10.00000.00000.00140.08680.9118
B20.00000.02000.12000.31000.5500
B30.00060.00180.06480.19200.7408
B40.00000.02160.54540.33300.1000
B50.00010.00000.06290.29540.6416