Research Article

[Retracted] Application of Heterogeneous Network Oriented to NoSQL Database in Optimal Postevaluation Indexes of Construction Projects

Table 7

The value of the generalization coefficient in the study.

Number of expertsConstruction method and technologyConstruction safety assurance measuresQuality assurance measuresConstruction scheduleConstruction machinery equipment levelTechnical staff composition

50.91540.88310.85140.89220.91830.9406
70.93810.91370.88920.92050.94020.9569
90.95110.93150.91160.93710.95290.9661
110.95970.94330.92650.94800.96110.9721
130.96570.95150.93700.95550.96690.9763
150.97010.95780.94500.96130.97120.9794