Research Article

Solving the Problem of Time, Cost, and Quality Trade-Off in Project Scheduling under Fuzzy Conditions Using Meta-Heuristic Algorithms

Table 5

Factors and candidate levels in artificial bee colony (ABC) optimization algorithm.

FactorsHS SymbolsHS levels

Number of beeNPNP(1): n
NP(2): 2 ∗ n
NP(3): 3 ∗ n

Abandoned limitLIMLIM(1): 50
LIM(2): 70
LIM(3): 100

IterationINTINT(1): n
INT(2):2 ∗ n
INT(3): 3 ∗ n