Research Article

Research on Stability of an Open-Pit Mine Dump with Fiber Optic Monitoring

Figure 26

On-site laying of optical fiber monitoring of the dump.
(a) Cable laying
(b) Cable binding
(c) Glue injection fixing
(d) Installation of the protective sleeve at the bent location
(e) Trench backfilling
(f) Monitoring station construction