Research Article

Case Study: In Situ Experimental Investigation on Overburden Consolidation Grouting for Columnar Jointed Basalt Dam Foundation

Table 4

Relationship between water-cement ratio (W/C) and water drainage rate.

W/C0.5 : 10.8 : 11 : 12 : 13 : 1
Drainage rate (%)
 Before grinding15.322.527.254.181.2
 After grinding1.218.421.850.179.8