Consolidation grouting pressure and length in the test area.

Hole depth (m)-5~00~55~1010~1515~2020~25
І (MPa)0.50.8~1.01.0~1.51.5~2.02.0~2.52.5~3.0
II (MPa)0.51.0~1.51.5~2.02.0~2.52.5~3.02.5~3.0
III (MPa)0.51.0~1.52.0~2.52.5~3.03.03.0