Consolidation grouting results of the #25 dam section.

HoleNumber of holesGrouting penetration (m)Cement injection (kg)Unit injection (kg/m)Average permeability (LU)Note

І56140.913799.297.94/5 m protective layer
II97270.14204.915.57/
III4012770.20.55/
Total19353818074.333.6/
І591475122658.583.1623.2425 m bedrock
II101252579721.831.579.05
III43107513890.5412.923.84
Total2035075216270.8442.6111.41