Research Article
Case Study: In Situ Experimental Investigation on Overburden Consolidation Grouting for Columnar Jointed Basalt Dam Foundation
Table 7
Consolidation grouting results of the #25 dam section.
| Hole | Number of holes | Grouting penetration (m) | Cement injection (kg) | Unit injection (kg/m) | Average permeability (LU) | Note |
| І | 56 | 140.9 | 13799.2 | 97.94 | / | 5 m protective layer | II | 97 | 270.1 | 4204.9 | 15.57 | / | III | 40 | 127 | 70.2 | 0.55 | / | Total | 193 | 538 | 18074.3 | 33.6 | / | І | 59 | 1475 | 122658.5 | 83.16 | 23.24 | 25 m bedrock | II | 101 | 2525 | 79721.8 | 31.57 | 9.05 | III | 43 | 1075 | 13890.54 | 12.92 | 3.84 | Total | 203 | 5075 | 216270.84 | 42.61 | 11.41 |
|
|