Research Article
Grouting Treatment of Water and Mud Inrush in Fully Weathered Granite Tunnel: A Case Study
Figure 12
Layout of detection hole: (a) cross section and (b) longitudinal profile. ZJ1~ZJ6 in the figure is the opening position of the inspection hole, and ZJ1~ZJ6 is the final hole position.
(a) |
(b) |