Research Article

Grouting Treatment of Water and Mud Inrush in Fully Weathered Granite Tunnel: A Case Study

Figure 12

Layout of detection hole: (a) cross section and (b) longitudinal profile. ZJ1~ZJ6 in the figure is the opening position of the inspection hole, and ZJ1~ZJ6 is the final hole position.
(a)
(b)