Research Article

Lessons from the Case History of a Massive Landslide Dam

Figure 5

(a) 2 m contour interval topographical map of Hattian Bala landslide dam showing the field investigation points of the authors’ study (measurements made in December 2006 and March 2007) and the rim of erosion gully (developed between December 2008 and June 2009); (b) 2 m contour interval topographical map of Karli lake area (adapted from [12]).
(a)
(b)