For deep-water faulted sandstone reservoirs, the general practice is to design long horizontal wells improving well productivity. During the project implementation stage, well tests are performed on all drilled wells to evaluate well productivity accurately. Furthermore, multisize chokes are often utilized in a shorten test time for loosen formation, high test cost, and high well productivity. Nevertheless, the conventional productivity evaluation approach cannot accurately evaluate the well test productivity and has difficulty in determining the underneath pattern. As a result, the objective of this paper is to determine a productivity evaluation method for multisize chokes long horizontal well test in deep-water faulted sandstone reservoir. This approach introduces a productivity model for long horizontal wells in faulted sandstone reservoir. It also includes the determination of steady-state test time and the productivity evaluation method for multisize chokes. In this paper, the EGINA Oilfield, a deep-water faulted sandstone reservoir, located in West Africa was chosen as the research target. Based on Renard and Dupuy’s steady-state equation, the relationship between the productivity index per meter and the length of horizontal section was derived. Consequently, this relationship is used to determine the productivity pattern for long horizontal wells with the same geological features, which can provide more accurate productivity evaluations for tested wells and forecast the well productivity for untested wells. After implementing this approach on the EGINA Oilfield, the determined relationship is capable to accurately evaluate the test productivity for long horizontal wells in reservoirs with similar characteristics and assist in examination and treatment for horizontal wells with abnormal productivity.

1. Introduction

Since the 1990s, deep-water turbidite sandstone reservoir becomes a hotspot for oil and gas exploration and development. Major oil and gas deep-water turbidite reservoirs have been found in places such as the Gulf of Mexico Basin in North America, the Campos Basin in South America, the Niger Delta in West Africa, and the South China Sea [1].

The drilling and well completion cost for a production well in deep-water oilfields is nearly 100 million US dollars. As a result, the general strategy in the development of deep-water oilfields is to drill less well and maintain a higher plateau production rate. For deep-water faulted oilfields, the general practice is to design long horizontal wells improving well productivity. During the project implementation stage, well tests are performed on all drilled wells to evaluate well productivity accurately. Thus, subsequent measurements can be taken if the well test productivity is lower than expected. Considering the loosen reservoir formation and high well productivity, multisize chokes were adopted to prevent sand production during the test process. Simultaneously, the well test time is usually kept in a very short due to test cost, crude oil storage, and other factors, which makes well productivity evaluation difficult. Therefore, the conventional productivity evaluation approach cannot accurately evaluate the well test productivity and has difficulty in determining the productivity pattern. Thus, it is necessary to establish an accurate productivity evaluation method for long horizontal wells using multisize chokes in deep-water faulted sandstone reservoirs. Currently, the Lower Congo and the Niger Delta Basin are the attraction points for the exploration and development of deep-water turbidite reservoirs. They have been studied by petroleum engineers all over the world, which include their deposition mechanism [2, 3], deposition model [3, 4], deposition characteristics, evolution pattern [1], channel distribution and configuration characteristics [57], connectivity mode and connectivity [8, 9], and water-cut rising mechanism and water injection optimization method [10]. In addition, the results of oil well productivity evaluation are mainly concentrated in the time correction coefficient [1113], interlayer interference coefficient [14], and equivalent test time [15] in the shallow water oilfields, while in deep-water faulted sandstone reservoirs, the test productivity evaluation is limited in aspect of the productivity test process and on-site operations [16]. There are only few studies on the productivity evaluation method with multisize chokes for long horizontal wells.

The EGINA Oilfield, a deep-water faulted sandstone reservoir, located in West Africa was evaluated in this paper. A productivity evaluation approach was established for long horizontal wells with multisize chokes in deep-water faulted sandstone reservoirs. The method is composed of the establishment of productivity model for long horizontal wells in faulted sandstone reservoirs, the determination of steady-state test time with multisize chokes, and the productivity evaluation method with multisize chokes. Based on Renard and Dupuy’s steady-state equation, the relationship between the productivity index per meter and the length of horizontal section was determined, and the pattern for test productivity in long horizontal wells with the similar geological features is derived. This finding can assist better understanding to the productivity evaluation for tested wells and forecast the well productivity for untested wells. By practicing in the EGINA Oilfield, the productivity evaluation approach and productivity pattern are proven to be reliable.

2. EGINA Oilfield Overview

The EGINA Oilfield is located in the deep-water contract area of OMLl130 in southern Nigeria, West Africa, about 160 km away from the Port Harcourt in the north (see Figure 1). The oilfield water depth is ranging from 1150 to 1750 m [16, 17]. It is operated by the TOTAL on behalf of the Nigerian National Petroleum Corporation (NNPC-Nigeria), the South Atlantic Petroleum Limited (SAPETRO-Nigeria), the PETROBRAS (Brazil), and the China National Offshore Oil Corporation (CNOOC China).

The EGINA Oilfield is a faulted anticline with complicated geological characters. The sedimentary facies of the reservoir is deep-water turbidite fan, and the lithology of the reservoir is fine-coarse sandstone which is mainly composed by quartz and feldspar. The reservoir is shallow buried, loose cemented, and weak compacted leading to medium-high porosity and high permeability. Primary intergranular pore forms the main reservoir spaces. The formation fluid is medium oil with low viscosity.

The EGINA Oilfield is developed using subsea wellhead and injection manifolds connected to an FPSO. The production has commenced from December 2018.

3. Purpose and Procedure of Productivity Well Test for Long Horizontal Well in Deep-Water Sandstone Oilfield

3.1. Test Purpose

The main purpose of the oil well productivity test is to:(1)The first purpose is removing completion fluids and breaking down the mud-cake into small chips which can pass through the screen. We need to clean the entire screen length down to low water cut prior to their tie-back to the subsea manifolds and to the FPSO [16](2)Another purpose of the productivity test is to collect fluid samples and obtain well/reservoir dynamic parameters relating to reservoir characteristics and completion efficiency (KH, skin, flow boundary, and production index), which help to reduce the uncertainty of productivity and fluid properties in the early stage of oilfield production

To make sure the oil field is reaching the production plateau as expected, the productivity test and evaluation of each well are carried out after the well is drilled and before it commences production.

3.2. Test Procedure

The productivity test design is completed by a well test software. Based on the expected range of reservoir physical parameters, a variety of test schemes are designed, and the optimized scheme is selected to determine the durations of well cleaning up and pressure buildup.

Small variations exist between each well test scheme. For unconsolidated sandstone reservoir, in order to prevent sand production, the general productivity test procedure is as follows: increase the choke sizes step by step by 4/64 and increase the daily oil production by no more than specific drawdown (4 bar for frac-packs and 2 bar for SAS and ES) or 300 m3/d. Before switching to the next choke size, the pressure of each choke size shall be kept stable for at least 2 hours, and sand production is monitored simultaneously [16].

4. Productivity Evaluation Method of Long Horizontal Well Test in Faulted Sandstone Oilfield

4.1. Productivity Model of Long Horizontal Wells in Faulted Sandstone Reservoirs with Different Boundaries

The assumptions are as follows: (1) the fluid in the formation is single-phase fluid with low compressibility; (2) the effect of gravity and capillary force is neglected; (3) the pressure in all parts of the formation is the initial reservoir pressure before the productivity well test; (4) the reservoir is homogeneous, and the fluid flow achieves Darcy seepage; and (5) the top and bottom boundaries of the formation are impermeable.

Figure 2 is a physical model of a horizontal well in a faulted sandstone reservoir. Assuming the reservoir thickness is and the horizontal well length of from the bottom boundary , the reservoir permeability in the direction is equal to ones in the direction, which is . Under different boundary conditions, the expression of dimensionless bottom hole flowing pressure for horizontal wells without wellbore storage and skin with a fixed production rate is [19, 20]:

where is the dimensionless wellbore storage coefficient; is the skin factor; is the under different boundaries conditions, dimensionless bottom hole flowing pressure for horizontal wells without wellbore storage, and skin with a fixed production rate ; is the daily oil production rate, m3/d; is the dimensionless length of horizontal section for horizontal well; is the dimensionless time; , , and are the dimensionless coordinates in the direction, direction, and direction, respectively; and , , and are the green function in the direction, direction, and direction, respectively;

Under different boundary conditions, , , and can be expressed as follows [19, 20]:(1)Under different boundaries conditions, can be expressed as follows:(i)Both boundaries are sealing in the direction(ii)Both boundaries are constant pressure in the direction(iii)Mixed boundaries in direction(sealing at , constant at )(2)Under different boundaries conditions, can be expressed as follows:(i)Both boundaries are sealing in the direction(ii)Both boundaries are constant pressure in the direction(iii)Mixed boundaries in the direction (sealing at , constant at )(3)In the case of no gas cap and bottom water in the direction, can be expressed as follows:

Considering wellbore storage and skin, the dimensionless bottom hole flowing pressure of horizontal well can be expressed as follows [19, 20]:

where is the under different boundaries conditions, dimensionless bottom hole flowing pressure for horizontal wells with wellbore storage, and skin with a fixed production rate in the Laplace space and is the Laplace transformation constant.

The Laplace numerical inversion of equation (9) is carried out to obtain the relationship between bottom hole flowing pressure and time, which can predict the productivity of long horizontal well with time in faulted sandstone reservoir under different boundary conditions.

4.2. Steady-State Time Determination of Multisize Chokes Test in Long Horizontal Well

For the well test with multisize chokes, it is necessary to determine whether the producer is steady or pseudo steady-state at all choke sizes and therefore select the appropriate methods to evaluate the test productivity. For a complex faulted sandstone reservoir with closed boundaries, a mathematical model can be established based on the reservoir parameters interpreted from the producer’s pressure buildup curve and the distribution characteristics of the reservoir and faults. Then, by simulating the well productivity test, the required time to reach the steady-state can be calculated.

4.3. Productivity Evaluation Method of Multisize Chokes Test in Long Horizontal Well Test

If well test with multiple choke sizes reach stable or pseudo steady-state, the data of these choke sizes can be used to derive the relationship between the bottom hole flowing pressure and the production rate. From equation (10), the reciprocal of the linear gradient is the productivity index of the test well.where is the bottom hole flowing pressure, MPa; is the formation pressure, MPa; is the daily oil production, m3/d; and is the productivity index of horizontal well, m3/d/MPa.

If the well tests with multiple choke sizes do not reach stable or pseudo steady-state, the test data of last choke size is used to calculate the transient productivity index, and the equivalent test time can be determined by equation (11) [15]. If the evaluated equivalent time does not reach stable or pseudo steady-state, the time correction coefficient, the productivity index at stable or pseudo steady-state divided by the transient test productivity index, can be obtained by the mathematical model established in Section 4.1. As a result, the productivity index at the stable or pseudo steady-state is obtained.where is the well test cumulative oil production, m3; is the daily oil production of last choke size, m3/d; and is the equivalent test time, .

5. Productivity Evaluation Method for Well Test Productivity Pattern of Long Horizontal Wells

To derive the productivity evaluation approach for test productivity pattern of long horizontal well, Renard and Dupuy’s equation [21] is analyzed, as shown in equation (12):we setwhere is viscosity of the formation crude oil, cp; is the reservoir permeability, mD; is the reservoir thickness, m; is the length of the horizontal section, m; is the wellbore radius, m; is the drainage radius, m; and , , , and are constant.

We set ,, and ,

from equation (13):

Square the both sides of equation (14):

From equation (15):

Substituting equation (16) into equation (17):

For long horizontal wells, the difference between ln(4re/L) and ln(h/(2πrw)) is small, while the length of horizontal wells is far greater than the reservoir thickness ; therefore:

Thus, constant can be neglected. Substituting equation (16) into equation (12):where is the productivity index per meter, m3/d/MPa.

Equation (20) underlines the linear relationship between and . Based on this relationship, the test productivity pattern of long horizontal oil wells with the similar geological features is determined, which can guide the productivity prediction of untested oil wells and improve the evaluation for the tested oil wells.

6. Applications and Discussions

The EGINA Oilfield adopts the development strategy “less wells with high production rate.” All drilled oil wells are conducted with the productivity test to remove completion fluids and ensure the accuracy of the test productivity. Due to the high well productivity and loosen reservoir formations, the test procedure increasing the test choke step by step (Section 3.2) is adopted to prevent sand production during the productivity test. At the same time, high test cost in deep-water oilfield is considered as the well test time is kept very short. For instance, the oil well P-4 was tested using 10 different choke sizes with increasing pattern. The maximum daily oil production was 1150 m3/d, and a total test time was 27.4 hours, as shown in Figure 3.

6.1. Well Test Productivity Evaluation with Multisize Chokes for P-4 Well
6.1.1. Determination of Steady-State Time for P-4 Well

To evaluate the well test productivity of the P-4 well, the first priority is to confirm whether the tests at all choke sizes have reached the steady or pseudo steady-state to select the appropriate method. P-4 is a horizontal well in a complex faulted sandstone reservoir; the well location map is illustrated in Figure 4. The mathematical model is established based on the reservoir parameters derived from the pressure buildup curve of P-4 (see Figure 5) and faults distribution characteristics. Subsequently, this model is used to simulate the procedure of well productivity test, and the time calculated for the well to reach the steady-state is 51 days.

6.1.2. Productivity Evaluation with Multisize Chokes for P-4 Well

From Figure 3, the ten choke sizes tested at P-4 well have not reached steady-state. The tested data of final choke size is used to calculate the transient productivity, and the transient productivity index of P-4 is 3666 m3/d/MPa. The equivalent test time calculated by equation (11) is 9.7 hours, combined with the productivity model in the previous Section 4.3; the time correction coefficient is 0.41, and the steady-state productivity index is 1503 m3/d/MPa.

6.2. Pattern of Productivity Evaluation for Long Horizontal Wells in Faulted Sandstone Oilfields

To derive the pattern of well test productivity for long horizontal wells in faulted sandstone reservoir, horizontal wells with similar geological features were screened out, and the relationship between the transient productivity index and mobility was analyzed. Based on Figure 6, the linear relationship is not obvious. However, the method introduced in this paper is able to determine the productivity index of each well at steady-state. As a result, the relationship between productivity index at steady-state and can be found based on equation (20), which is a nicely fit (see Figure 7). Therefore, this approach can evaluate the pattern of tested well productivity and predict the productivity of untested wells.

6.3. Examination and Treatment of Horizontal Wells with Abnormal Test Productivity
6.3.1. Examination of Horizontal Wells with Abnormal Well Test Productivity

To ensure the productivity of horizontal wells as expected before production commencement, an examination of the reliability for the test productivity becomes a necessary step. To begin with, the method introduced in Section 4 is utilized to evaluate the well test productivity of tested wells. Then, the reliability of test result is analyzed by the productivity trend of tested horizontal wells mentioned in Section 5. If a well with abnormal test productivity exists, it will be suggested to take corresponding measures. For example, after productivity evaluation of well P-3, it is compared with relationship between productivity index per meter of horizontal wells at steady-state and . Based on Figure 8, the tested productivity of P-3 is significantly lower than other wells. From the pressure buildup interpretation of P-3 (see Figure 9), its skin factor is 34, which is obviously too high. Thus, serious reservoir pollution near the well bore is suggested to be the cause of the high skin factor.

6.3.2. Treatment of Horizontal Wells with Abnormal Well Productivity

Acidizing treatment was carried out to remove the reservoir pollution near the wellbore of P-3. The productivity after acidizing treatment is compared with the relationship between the productivity index per meter of tested horizontal wells at steady-state and the . From Figure 10, the productivity is on the trend line, and the skin factor becomes 0.20 (see Figure 11), indicating that the pollution near the wellbore has been removed.

7. Conclusion

(1)A productivity evaluation method for multisize chokes long horizontal wells in deep-water faulted sandstone reservoirs is established to consider loosen reservoir formation, high well productivity, and short well test time, which can determine the productivity of long horizontal wells at steady-state(2)Based on Renard and Dupuy’s steady-state equation, the relationship between the productivity index per meter and the length of horizontal section was derived. The trend line of test productivity for long horizontal wells under the same geological features is obtained, which can guide to a more accurate productivity evaluation for tested wells and forecast the productivity for untested wells(3)Based on the field practice in the EGINA Oilfield, productivity evaluation and pattern derived from the tested results at steady-state can suggest appropriate treatment method for horizontal wells with abnormal productivity. This method is proven to be reliable and can evaluate the test productivity of long horizontal wells in similar deep-water faulted sandstone reservoirs

Data Availability

The data used to support the findings of this study are available from the corresponding author upon request.

Conflicts of Interest

The authors declare no conflict of interest.

Authors’ Contributions

Conceptualization was done by Zhiwang Yuan and Li Yang; methodology was done by Zhiwang Yuan; validation was done by Zhiwang Yuan and Yingchun Zhang; writing the original draft preparation was done by Zhiwang Yuan; writing the review and editing were done by Zhiwang Yuan, Rui Duan, Xu Zhang, and Yihua Gao.

Acknowledgments

The authors are indebted to Baoquan Yang for sharing their meaningful points and discussions. This research was funded by the National Science and Technology Major Project (grant number 2017ZX05032-004).