A Dynamic Risk Assessment Method for Deep-Buried Tunnels Based on a Bayesian Network

Table 4

Risk rating factors grading criteria.

FactorsGrading

Objective factorsSection sizeMediumLarge
Construction methodCenter diagram (CD) methodBench cut method (BCM)Ring cut method (RCM)Full face excavation method (FFEM)Center cross diagram (CRD) method
Tunnel depth<15 m15~25 m>25 m
Surrounding rock levelIVVVI
GroundwaterNo waterWater leakingWater gushing
Mud inrushNo mudMud leakingMud inrush
Subjective factorsPrereinforcement effectsGoodMediumPoor
Support timingIn timeLate
Construction qualityGoodMediumPoor
Construction experienceWell experiencedMediumInexperienced
Construction managementStrictMediumPoor
Support strengthHighMediumLow
Monitoring factorsInner-tunnel observationNormalSlight cracksSlip off
Arch crown convergenceIIIIII
Side wall displacementIIIIII