Research Article
A Dynamic Risk Assessment Method for Deep-Buried Tunnels Based on a Bayesian Network
Table 5
Dynamic risk rating description.
| | Risk rating | I | II | III |
| Risk description | Low | Medium | High | Suggestions | Normal construction is allowable | Monitoring and support should be strengthened in time | Should stop work immediately and take measures |
|
|