Research Article
Research on a Numerical Simulation and Prediction Model of Floor Mining Failure Depth in the Chenghe Mining Area
Figure 8
Floor failure range with different burial depths under the working face width of 160 m.
(a) Burying depth 100 m |
(b) Burying depth 200 m |
(c) Burying depth 300 m |
(d) Burying depth 400 m |
(e) Burying depth 500 m |
(f) Burying depth 600 m |