Research Article

A New Methodology for the Multilayer Tight Oil Reservoir Water Injection Efficiency Evaluation and Real-Time Optimization

Table 3

Tracer test results of the T6 well group.

InjectorTracer type & inject dateTracer wellTracer breakthrough dateTracer breakthrough time (day)Tracer peak concentration (ng/ml)Duration (day)

T6Gd 3/20/2019P85/9/20195052.430
P75/17/20195897.0126
Sm 3/15/2019P84/25/20194182.4121