Research Article

A Practical Design Method for Reducing Postconstruction Settlement of Highway Subgrade Induced by Soil Creep

Table 3

Settlement calculation results.

OCR

12(1.0)14.9001.0620.02270.021
23(4.5)17.3511.0540.02310.032
32(7.0)0.9518.0541.0340.02420.023
42(9.0)0.9323.7121.0280.02450.023
52(11.0)0.8930.2841.0240.02480.023
62(13.0)0.8637.0381.0200.02510.023
Sum0.145

Note: the number in parenthesis is the depth of the middle of each layer.