Research Article
A Practical Design Method for Reducing Postconstruction Settlement of Highway Subgrade Induced by Soil Creep
Table 3
Settlement calculation results.
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Note: the number in parenthesis is the depth of the middle of each layer. |
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Note: the number in parenthesis is the depth of the middle of each layer. |