Intelligent Control of Smooth Blasting Quality in Rock Tunnels Using BP-ANN, ENN, and ANFIS

Table 26

Comprehensive optimization control model output training data.

No.Maximum overbreak (m)Maximum underbreak (m)Area of overbreak (m2)Volume of overbreak (m3)Blast hole utilization factor (%)

10.810.2310.410.479
20.70.687.787.7892
30.730.0410.915.4684
40.850.049.644.8284
50.650.027.693.8595
60.780.416.039.0589
70.660.247.523.7689
80.570.087.983.9989
90.640.1411.785.8995
100.80.1412.633.7995
110.780.2612.172.4395
120.730.1110.165.0895
130.560.039.884.9495
140.660.139.620.9684
150.980.2113.914.1792
160.60.18.672.695
170.520.077.741.5595
180.70.17.483.7495
190.740.058.894.4595
200.850.0110.635.3295
210.580.196.093.0592
220.780.0312.433.7392
230.750.0712.922.5892
240.590.0310.95.4592
250.690.284.72.3579
260.580.029.462.8479
270.880.0494.579
280.910.338.584.2984
290.860.2610.975.4984
300.710.346.853.4387
310.610.099.974.9987
320.450.145.632.8287
330.490.156.613.3187
340.730.178.924.4682