Research Article

Failure Analysis of a Highway Cut Slope with Anti-Slide Piles

Figure 8

Coupled analysis results of the cut slope with the actual construction steps.
(a) The pore pressure after 1-day rainfall
(b) The pore pressure after 3-day rainfall
(c) The pore pressure after 5-day rainfall
(d) The maximum shear stress increment