Research Article

A Case Study of Energy-Saving and Frost Heave Control Scheme in Artificial Ground Freezing Project

Figure 2

(a) The main drilling working face; (b) auxiliary drilling working face; (c) profile of freezing pipes.
(a)
(b)
(c)