Research Article

Study on the Floating of Large Diameter Underwater Shield Tunnel Caused by Synchronous Grouting

Table 3

The main calculation parameters of underwater tunnel.

Tunnelling speed (m/s)Outer radius of segment (R/m)Thickness of shield tail gap (m)Grout density (kg/m3)Plastic viscosity ()Dynamic shear force ()

0.000356.90.251900215