Research Article
Defects and Improvement of Predicting Mine Water Inflow by Virtual Large Diameter Well Method
Table 3
Comparison between the DVLDWM calculation and actual observed results.
| The excavated distance of the mining panel (m) | Mine water inflow (m3/h) | Calculation results | Actual observed results |
| 15 | 5.19 | 3.1 | 30 | 5.41 | 3.5 | 45 | 5.91 | 3.4 | 60 | 6.43 | 4.0 | 75 | 6.92 | 4.8 | 90 | 7.42 | 6.9 | 105 | 8.50 | 8.4 | 120 | 8.28 | 7.0 | 135 | 8.78 | 8.5 | 150 | 9.16 | 8.7 | 165 | 10.43 | 8.4 | 180 | 10.79 | 7.0 | 195 | 11.17 | 10.1 | 210 | 11.62 | 11.1 | 225 | 12.07 | 10.4 | … | … | … | 390 | 18.65 | 16.2 | 405 | 19.11 | 24.8 | 420 | 19.58 | 19.1 | 435 | 19.88 | 19.3 | 450 | 20.36 | 19.1 | 465 | 20.83 | 19.0 | 480 | 21.29 | 21.0 |
|
|