Comparison between the DVLDWM calculation and actual observed results.

The excavated distance of the mining panel (m)Mine water inflow (m3/h)
Calculation resultsActual observed results

155.193.1
305.413.5
455.913.4
606.434.0
756.924.8
907.426.9
1058.508.4
1208.287.0
1358.788.5
1509.168.7
16510.438.4
18010.797.0
19511.1710.1
21011.6211.1
22512.0710.4
39018.6516.2
40519.1124.8
42019.5819.1
43519.8819.3
45020.3619.1
46520.8319.0
48021.2921.0