Research Article

Study on the Deformation Mechanism of the Bottom Plate along the Empty Lane of Deep Mining and the Control Technology of the Bottom Drum

Figure 9

Design of deep hole cutting top discharge blasting scheme for return mining roadway.
(a) Schematic diagram of the arrangement of blast holes
(b) Cross-sectional view of the arrangement of blast holes on the yunshun side