Research Article
Study on Layered-Backfill-Based Water Protection Technology of Thick Coal Seam in the Ecologically Fragile Mining Area in Western China
Table 1
Summary of field testing results of the water-conducting fractured zone in the Yushen mining area and the adjacent mining areas.
| Mining area | Coal mine | Working face length (m) | Depth of cover (m) | Mining method | Mining height (m) | Height of water-conducting fractured zone (m) | Fracturing-mining ratio |
| Yushen mining area | I | Jinjitan coal mine | 300 | 229.6~262.1 | Slice mining | 5.5 | 110.14~143.37 | 20.03~26.07 | 300 | 243.6~253.4 | Full-height mining at one time | 5.3~7.5 | 133.45~167.5 | 22.33~25.18 | Xuemiaotan coal mine | 281.6 | 210 | Fully mechanized mining | 5.7 | 106–124 | 18.6~21.8 | Hanglaiwan coal mine | 300 | 253 | Slice mining | 4.5 | 93.87~114.38 | 20.86~25.42 | 300 | 230 | Slice mining | 5.0 | 110.3~124.8 | 22.06~23.51 | Caojiatan coal mine | 360 | 269.8~273.4 | Slice mining | 6.0 | 136.1~139.15 | 22.68~23.19 | Yushuwan coal mine | 255 | 284~291 | Slice mining | 5.0 | 117.8~135.4 | 23.56~27.08 | II | Jinjie coal mine | 370 | 108~124 | Fully mechanized mining | 3.5 | 45.7 | 13.1 | III | Longde coal mine | 300 | 201.04~202.80 | Fully mechanized mining | 3.96 | 69.4~76.85 | 17.53~19.41 | Xiaobaodang no.1 coal mine | 350 | 295~310 | Fully mechanized mining | 5.8 | 152.01~158.78 | 26.21~27.38 |
| Yuheng north mining area | Yuyang coal mine | 200 | 182~216 | Fully mechanized mining | 3.5 | 84.8~96.3 | 24.0~27.5 |
| Hujierte mining area | Bayangaole coal mine | 260 | 610 | Fully mechanized mining | 5.3 | 126 | 23.7 | Menkeqing coal mine | 300 | 689 | Fully mechanized mining | 4.7 | 110 | 23.4 |
|
|