Research Article

Design and Analysis of Grouting Pressure in Slurry Pipe Jacking Based on the Surrounding Soil Stability Mechanical Characteristics

Figure 9

Geological radar map of segment detection. (a) Left side of the fourth pipe. (b) Right side of the fourth pipe. (c) Left side of the fifth pipe. (d) Right side of the fifth pipe.
(a)
(b)
(c)
(d)