|
Secondary indicators | Entropy | Weight |
|
L— Length of excavation face, m | 0.99974 | 0.00324 |
U— Perimeter of roadway, m | 0.99963 | 0.00450 |
tcs— Initial temperature of surrounding rock, °C | 0.99973 | 0.00335 |
tpj—Average temperature of air flow, °C | 0.99953 | 0.00585 |
Mw—Water inflow, kg·h-1 | 0.96698 | 0.40661 |
twH—Initial temperature of water, °C | 0.99974 | 0.00324 |
twK—Final temperature of water, °C | 0.99974 | 0.02401 |
G—Mass flow of air flow, kg·s-1 | 0.99805 | 0.02401 |
△Z—Difference between air inlet and bottom elevation, m | 0.99047 | 0.11733 |
η— Efficiency of electromechanical equipment, % | 0.99974 | 0.00324 |
N— Power of electromechanical equipment, kW | 0.99974 | 0.00324 |
n—The number of equipment | 0.99974 | 0.00324 |
Cm—Specific heat capacity of ore, KJ/(kg·°C) | 0.99974 | 0.00324 |
△t—Temperature difference between ore and air, °C | 0.98261 | 0.21416 |
Ms— Surface area of filling body during one-time filling, m2 | 0.99139 | 0.10603 |
n—The number of worker at the working face | 0.99726 | 0.03379 |
Gh—Daily gunpowder consumption, kg·d-1 | 0.99499 | 0.06170 |
|