Research Article
Multiscale Investigations of Overtopping Erosion in Reinforced Tailings Dam Induced by Mud-Water Mixture Overflow
Figure 14
A series of demonstrations of the erosion destruction process at (a) the simulation time =10 s, (b) the simulation time =20 s, (c) the simulation time =35, s and (d) the simulation time =50 s.
(a) |
(b) |
(c) |
(d) |