Research Article

Study on Large Deformation Prediction and Control Technology of Carbonaceous Slate Tunnel in Lixiang Railway

Table 1

Tunnel site monitoring and measurement data.

Monitoring sectionPeripheral convergence value (mm)Convergence time (d)Vault settlement value (mm)Settlement time (d)Bedding dip (°)

D1K87+060870.647663.44815.0
D1K87+070661.749512.34230.0
D1K87+090923.553649.45030.0
D1K87+100546.948551.74645.0
D1K87+110712.551687.5480.0
D1K87+120694.348684.25030.0
D1K87+480341.542320.1410.0
D1K87+490406.744387.43945.0
D1K87+500319.846331.54330.0
D1K87+510734.251621.85530.0
D1K87+520921.955754.45235.0
D1K87+530655.849532.23845.0

Note: due to space reasons, only some section monitoring and measurement data are listed randomly.