Research Article

Study on Large Deformation Prediction and Control Technology of Carbonaceous Slate Tunnel in Lixiang Railway

Table 3

Medium term forecast results.

Monitoring cycle (d)Peripheral convergence (mm)BP neural network modelGA-BP neural network model
Estimate (mm)Relative error (%)Estimate (mm)Relative error (%)

31686.2669.42.45696.71.53
32694.7707.91.90702.61.14
33699.2713.82.09710.61.63
34702.5719.42.41711.81.32
35705.6721.82.30713.91.18
Average relative error2.231.36