Analysis and Field Measurement on the Internal Force Variation Laws of Steel Pipe Columns in Subway Stations
Table 3
Axial forces increment of steel pipe columns in different construction stages of the pile foundation stations (unit: kN).
| Station ID | Station | Axial force increment of the steel pipe columns | Stage 1 | Stage 2 | Stage 3 | Total | Remark |
| P1 | Youanmen Station | 8482 | 2797 | 1177 | 12456 | —— | P2 | Jinrongjie Station | 8554 | 1862 | 2881 | 13297 | —— | P3 | Beitaipingzhuang Station of line 12 | 8792 | 2173 | — | 10465 | Stage 3 has not yet begun | P4 | Beitaipingzhuang Station of line 19 | — | — | 3257 | 6414 | Construction in stages 1 and 2 has been completed when the measuring points installed | P5 | Niujie Station | — | — | 1982 | 1982 | Construction in stages 1 and 2 has been completed when the measuring points installed |
|
|