Multiobjective Optimization Method for the Diversion Scheme of Lean Concrete Overtopped Cofferdam under Multiconstraint Conditions
Table 1
Construction capacity parameter.
Item
Excavation speed of lean cemented cofferdam foundation (m
3
/d)
Pouring speed of lean cemented cofferdam (m
3
/d)
Maximum
2500
1100
Average
2000
1400
Minimum
1500
1700