Research Article

Multiobjective Optimization Method for the Diversion Scheme of Lean Concrete Overtopped Cofferdam under Multiconstraint Conditions

Table 5

Noninferior solution set table under different reliability.

WeightConstruction reliability
80%90%99.9%
(m) (m)Average construction time (d) (m) (m)Average construction time (d) (m) (m)Average construction time (d)

0.90 : 0.1038.39.011436.39.110332.29.683
0.75 : 0.2538.39.011436.39.110332.29.683
0.67 : 0.3338.39.011436.39.110332.29.683
0.50 : 0.5036.39.110336.39.110332.29.683
0.33 : 0.6733.79.49033.79.49032.29.683
0.25 : 0.7532.29.68332.29.68332.29.683
0.10 : 0.9028.010.56528.010.56528.010.565